1 ভিতরে - অনুবাদ করা

A disciplined maintenance plan keeps every Industrial Three Phase 2 Poles Electric Vibration Motor running at peak performance. Begin with a monthly vibration spectrum using a handheld analyzer. An increase in high-frequency harmonics above 3 kHz often indicates bearing cage wear inside the Industrial Three Phase 2 Poles Electric Vibration Motor, prompting replacement before catastrophic failure.
Lubrication intervals depend on duty cycle. For an Industrial Three Phase 2 Poles Electric Vibration Motor operating 16 hours per day, regrease every 2,000 hours with 25 g of polyurea-based grease. Over-greasing is a common error; excess lubricant migrates into the windings and shorts the Industrial Three Phase 2 Poles Electric Vibration Motor. Use the relief port method: pump slowly until fresh grease exits the purge.
Inspect the eccentric weights quarterly. Loose clamp bolts can shift, causing the Industrial Three Phase 2 Poles Electric Vibration Motor to vibrate asymmetrically and shake the entire frame. Torque the clamp screws to 45 N·m and apply Loctite 243 to prevent unwinding.
https://www.cnguangling.com/pr....oduct/2poles-series/
If the Industrial Three Phase 2 Poles Electric Vibration Motor fails to start, check the contactor first. Pitted contacts drop phase voltage below 340 V, starving the Industrial Three Phase 2 Poles Electric Vibration Motor and tripping thermal overloads. Replace the contactor rather than attempting to file the contacts; modern silver-cadmium tips cannot be restored.
Unusual noise—often described as “marbles in a can”—signals bearing failure inside the Industrial Three Phase 2 Poles Electric Vibration Motor. Isolate the unit, remove the end shields, and inspect for brinelling or grease discoloration. Swap in genuine OEM bearings to maintain the original dynamic balance of the Industrial Three Phase 2 Poles Electric Vibration Motor.
Finally, log all readings in a CMMS. Trending data will reveal whether the Industrial Three Phase 2 Poles Electric Vibration Motor is approaching end of life, allowing procurement to order spares before unplanned downtime strikes the production line.

image